## Brew/Production Side (right side + back section)
- **Bisecting wall:** starts at back-left corner, runs ~70ft forward, turns 90° right to form back-of-bar wall. Encloses ~30ft deep back section from patron space.
- **Back wall left to right:** end of patron space → bisecting wall → bathroom 1 (~8ft wide) → moproom (3×12, narrow side facing the 20ft width) → brew house fills remaining width to right wall
- **Front (right side):** bar → cold room → office → brew house
---
## Brew House (right side, back → front)
### Hot Side (back → front)
**Back corner:**
- Stacked IBCs: CLT top / waste water bottom
- Sink
- RO unit (300 gal/day) mounted on wall above/next to CLT — feeds CLT, waste goes to waste tank
**HLT:**
- 7bbl electric
- 4×8kW 3-phase heating elements (208V Y config)
- Normal operation: 3 elements on HLT duty, 4th terminal available to move to RIMS
**Mash Tun:**
- 4bbl total (3.5bbl usable)
- RIMS system with same 8kW heating element (moved from HLT terminal when needed)
- CIP ball system
- PID pump — hard piped to kettle, bidirectional
**Kettle:**
- 4bbl (3.5bbl usable)
- 4 dedicated 6kW 3-phase heating elements (24kW total)
- Hard piped to mash tun with PID pump between
- Can vorlauf, whirlpool, or transfer between vessels
- German decoction capable (send mash to kettle, boil, return to mash tun)