Add Power Distribution Hub (PDH) documentation
- REV-11-1850, 20x 40A high-current + 3x 15A low-current + 1 switchable - CAN telemetry, USB-C diagnostics, LED voltage display - WAGO toolless terminals, reverse polarity protection - Wire gauge specs, fusing strategy
This commit is contained in:
82
sources/2890/power-distribution-hub.md
Normal file
82
sources/2890/power-distribution-hub.md
Normal file
@@ -0,0 +1,82 @@
|
||||
---
|
||||
title: "Power Distribution Hub — REV-11-1850"
|
||||
tags:
|
||||
- hardware
|
||||
- power
|
||||
- electrical
|
||||
- REV
|
||||
- 2890
|
||||
- ion
|
||||
type: hardware-spec
|
||||
owner: 2890
|
||||
status: active
|
||||
sources:
|
||||
- "https://www.revrobotics.com/rev-11-1850/"
|
||||
- "https://docs.revrobotics.com/ion-control/pdh/overview"
|
||||
---
|
||||
|
||||
# Power Distribution Hub — REV-11-1850
|
||||
|
||||
## Overview
|
||||
|
||||
The **Power Distribution Hub (PDH)** is Team 2890's central power distribution board. It takes battery power and routes it to all robot systems — motors, controllers, sensors, and accessories. Every wire from the battery goes through the PDH first.
|
||||
|
||||
## Key Features
|
||||
|
||||
- **20 high-current channels** (40A max each) — for motors and motor controllers
|
||||
- **3 low-current channels** (15A continuous, 20A peak) — for pneumatics, sensors
|
||||
- **1 switchable low-current channel** — on/off control for LEDs, accessories
|
||||
- **Toolless WAGO terminals** — color-coded, latching (no screws)
|
||||
- **CAN connectivity** — telemetry feedback to robot controller
|
||||
- **USB-C** — hardware client diagnostics and firmware updates
|
||||
- **LED voltage display** — real-time battery voltage reading
|
||||
- **ESD protection**
|
||||
- **Reverse polarity protection** — protects the PDH itself (not downstream devices)
|
||||
|
||||
## Channel Allocation
|
||||
|
||||
| Channel Type | Count | Max Current | Typical Use |
|
||||
|--------------|-------|-------------|-------------|
|
||||
| High-current | 20 | 40A | SPARK Flex, motors, mechanisms |
|
||||
| Low-current | 3 | 15A/20A peak | Pneumatics, sensors |
|
||||
| Switchable | 1 | 15A | LEDs, indicators |
|
||||
|
||||
## Electrical Specifications
|
||||
|
||||
| Parameter | Value |
|
||||
|-----------|-------|
|
||||
| Operating voltage | 4.7–18V |
|
||||
| Power input gauge | 18–6 AWG (solid), 18–4 AWG (stranded) |
|
||||
| Wire strip length | 0.72–0.79 in |
|
||||
| CAN termination | 120Ω (configurable) |
|
||||
| CAN wire gauge | 26–14 AWG |
|
||||
|
||||
## Wiring Notes
|
||||
|
||||
- **Reverse polarity protection** on the PDH — but it does NOT protect downstream devices. Double-check polarity before wiring.
|
||||
- Use ferrules with square or hex crimps for reliable connections
|
||||
- CAN bus requires 120Ω termination on last device
|
||||
|
||||
## Connection to Training
|
||||
|
||||
**For students:** The PDH is the heart of the robot's electrical system. Key concepts:
|
||||
- **fusing** — each channel protected by ATO/ATM fuse or breaker. Without a fuse, a stalled motor can melt wiring.
|
||||
- **voltage drop** — long wire runs lose voltage. PDH gives real-time reading so you can catch battery sag before it kills a motor.
|
||||
- **current division** — total current = sum of all channel currents. 20 motors × 40A = you need thick battery cables.
|
||||
- **CAN telemetry** — PDH reports voltage, current per channel back to the roboRIO. This is how you see "low battery" warnings on the driver station.
|
||||
|
||||
**Related training modules:**
|
||||
- [[neo-vortex-motor]] — motor that draws from PDH channels
|
||||
- [[spark-flex]] — controller that connects to PDH high-current channels
|
||||
- [[ion-build-system]] — integrates with REV ION electrical system
|
||||
- [[frc-electrical-basics]] — wire gauge, fusing, common faults
|
||||
|
||||
## Source Links
|
||||
|
||||
- Product: https://www.revrobotics.com/rev-11-1850/
|
||||
- Docs: https://docs.revrobotics.com/ion-control/pdh/overview
|
||||
- Specs: https://docs.revrobotics.com/ion-control/pdh/specs
|
||||
|
||||
## Notes
|
||||
|
||||
The PDH replaced the old "breaker panel + PDP" approach. Teams used to run separate wires from a central breaker to each load. The PDH centralizes it with CAN monitoring — you can see exactly how much current each mechanism is drawing in real time. Useful for debugging why the climber feels sluggish.
|
||||
Reference in New Issue
Block a user