Commit Graph

3 Commits

Author SHA1 Message Date
MrC
6228a259b6 Remove draft flags — working in non-draft for review period
Training button stays off on crew page during review
2026-05-07 22:16:14 +00:00
MrC
a16f1b8165 Entry Path stones 1-3: merged voice + substance from both drafts
Stone 1: FIRST Overview — Dean Kamen origin, 4 programs, Gracious Professionalism (Woodie Flowers), Coopertition, Invention+Innovation, season timeline, match breakdown (15s auto/2min teleop/30s end game), championship structure

Stone 2: 2890 Our Story — Collective name origin, four eras (2009 founding through present), students run this, roles table, expectations, team beliefs, gear list (MK4i/NEO Vortex/SPARK Flex/PhotonVision)

Stone 3: Youth Safety — why this matters, non-negotiables, tool-specific rules with 'what kills people' framing (lathe/mill/drill press/welder/grinder/band saw), electrical safety, FIRST Youth Protection (two-deep, background checks, communication), consequences table, 7-item pre-shop checklist

All in young mentor/alumni voice, full content, complete
2026-05-07 22:11:39 +00:00
MrC
03c380d73a Entry Path stones 1-3: FIRST Robotics overview, 2890 Our Story, Youth Safety
Young mentor/alumni voice. Full content — not abbreviated.
Stone 1: FIRST origin, 4 programs, 3 core values, season structure, match breakdown
Stone 2: Team history 2009-present, Collective name, roles, expectations, gear
Stone 3: Tool-specific safety (lathe, mill, drill press, welder, grinder, band saw),
         electrical safety, FIRST Youth Protection, online conduct, consequences

Entry Path page links all three stones in order.
Status: draft — not yet published to Quartz
2026-05-07 22:04:11 +00:00